Dan Allen Projects Impact Traffic, Parking
Two repaving projects are beginning on Monday, May 11, that will affect traffic on Dan Allen Drive as well as parking lots accessed via Dan Allen Drive and Faucette Drive.
Repaving of Dan Allen Drive from the pedestrian table north to Hillsborough Street:
This portion of Dan Allen Drive will be closed from Monday, May 11, through Friday, May 15.
- No access to Nelson South and Nelson West parking lots; closed. (“AS” permitholders may be relocated).
- Access the Dan Allen Deck from Hillsborough Street via Friendly Drive.
- Alternative parking in the Dan Allen Deck.
Repaving of Dan Allen Drive south from Sullivan Drive to Western Boulevard:
This portion of Dan Allen Drive will be closed from Monday May 11, through Friday, May 15.
- In addition to repaving this area, a manhole will also be replaced.
- No Parking on Faucette Drive from Morrill Drive to Dan Allen Drive.
- No Parking in the Weaver East lot.
- Alternative parking in the Wood Lot, Morrill Drive and West Deck.
Staff permits are valid in all student parking areas and parking decks through Aug. 18.
Wolfline detours:
Wolfline will be operating limited service during this time and will detour off the affected roads. Visit the Wolflike site for the latest information about detours/missed stops or contact Kim Paylor, transit manager, klpaylor@ncsu.edu, 513-7400. A real-time Wolfline visualization system is also available online.
Paving-related questions? Please contact Johnny Cline, facilities repair and renovation, johnny_cline@ncsu.edu, 515-9929.
Manhole-replacement questions? Please contact Greg Selzer, design and construction services, gjselzer@ncsu.edu, 515-6254.
Parking questions? Please contact David Gregory, dwgrego2@ncsu.edu, 515-1601.
- Categories: